Challenge: Repair and rebuild Weiler Barrel Read More…
Bradken
6 Metre, 6 Ton Steel Furnace Base
Refurbish and re-machine the sealing area on the furnace base for correct alignment to the furnace lid.
Applying a Renshaw touch probe to gauge variation, WEC utilised our CNC floor borer to re-machine the furnace base to strict tolerances provided by Bradken. The project was picked up and delivered to Bradken using our WEC truck.
Furnace base delivered back to Bradken within 24 hours, dramatically reducing downtime for the client.
Challenge: Repair and rebuild Weiler Barrel Read More…
Challenge: Complete overhaul and rebuild of valve Read More…
Challenge: CNC programming to re-machine the deck pockets to OEM tolerances, using our CNC floor borer. The project was collected from, and delivered to, Parker Hannifin using our WEC vehicle. Read More…