Challenge: CNC programming to re-machine the deck pockets to OEM tolerances, using our CNC floor borer. The project was collected from, and delivered to, Parker Hannifin using our WEC vehicle.
Challenge: Refurbish and re-machine the sealing area on the furnace base for correct alignment to the furnace lid.
Challenge: Machine the screw to fit hardened wear shoes, within a 48-hour timeframe.
Challenge: Within a 24-hour timeframe, modify suction roller to provide machining of grooves for water displacement